Eeyou Istchee James Bay, Quebec, Canada
| Chemistry | Hardrock |
|---|---|
| Stage | In development |
| Annual capacity | 800 kt/y SC6-eq nameplate (developer, FS) |
| Resource | 141.4 Mt @ Indicated 108.0 Mt @ 1.40% Li2O / 166 ppm Ta2O5 / 66 ppm Ga; Inferred 33.4 Mt @ 1.33% Li2O / 156 ppm Ta2O5 / 65 ppm Ga |
| Mine life | 20 years · ≈ 2030–2050 |
| First production (target) | Q3 2030 (start of mining operations / first concentrate, per Mar 2026 EIS Table 5-2; Oct 2025 FS had May 2030); design capacity 5.1 Mt/yr ore reached Q1 2032 |
| Development stage | FS |
Mine-life end year is an estimate (from first-production target); timing can shift with reserves, expansions or restarts.
| Ticker | Operator | Stake | Status |
|---|---|---|---|
| PMET | PMET Resources | 100% | feasibility |
Approximate location.
| Customer | Product | Volume | Term | Status | Citation |
|---|---|---|---|---|---|
| PowerCo SE (wholly-owned subsidiary of Volkswagen AG) | SC5.5 spodumene concentrate | 100 kt/y | from 2025-01-21 | binding term sheet | linked source link |
Agreements disclosed in filings; each row shows its citation strength — cached filing (primary doc cached in the vault), linked source (public URL, may rot), vault note (curated note, secondary provenance), unsourced (no source on record). Volumes are as disclosed; pricing terms are confidential and not shown.
Every figure cited to a primary-source filing. Buy just the block you need, or the full report / all data.
See a free sample Agent API & pricing →
Agents: GET /vault?entity=Shaakichiuwaanaan Project&level=mine · per-call USDC via x402