Lithium Valley, Minas Gerais, Brazil
| Chemistry | Hardrock |
|---|---|
| Stage | In development |
| Annual capacity | 146 kt/y SC6-eq nameplate (developer) |
| Resource | 8.457 Mt @ 1.20% Li2O (Measured+Indicated, 0.3% cut-off); Proven reserve 1.23% Li2O (1.169% diluted) |
| Mine life | 8 years · ≈ 2025–2033 |
| Development stage | construction / pre-production (post-DFS; construction partners selected Apr 2026) |
Mine-life end year is an estimate (from 2025 reserve statement); timing can shift with reserves, expansions or restarts.
| Ticker | Operator | Stake | Status |
|---|---|---|---|
| ATLX | Atlas Lithium | 100% | feasibility |
Approximate location.
| Customer | Product | Volume | Term | Status | Citation |
|---|---|---|---|---|---|
| undisclosed (2 parties) | SC6 | — | from 2025-08-01 | active | linked source link |
| Mitsui & Co. | SC6 | 60 kt/y | from 2024-03-28 | active | cached filing ex10-3.htm |
Agreements disclosed in filings; each row shows its citation strength — cached filing (primary doc cached in the vault), linked source (public URL, may rot), vault note (curated note, secondary provenance), unsourced (no source on record). Volumes are as disclosed; pricing terms are confidential and not shown.
Every figure cited to a primary-source filing. Buy just the block you need, or the full report / all data.
See a free sample Agent API & pricing →
Agents: GET /vault?entity=Neves Project&level=mine · per-call USDC via x402